CESA CONFLUENCE
Tucumann Engenharia started the execution of the Confluência SHPP with a capacity of 27 MW.
This project marks the beginning of another branch of engineering in which Tucumann specializes: Hydroelectric Power Plants.
In this work we will have expressive dams, use of conventional and rolled concrete, adduction channel, forced conduit, catchment tunnel, in addition to excavations in soil and rock blasting.
LocalizationParanáYear2021




